Phase II Work Photos


Teardown of the original shed

More demolition by volunteer worker


Finally…down to the ground floor


Clearing way for the new foundation

Future site of Documentation Center with renovated house in background

Careful removal of the old roof tiles for later reuse


Pre-fabricated walls are placed in position by crane


Aerial view of ground floor with renovated Phase I house in background


Offloading building materials by crane

“Massachusetts of Boston” replica (in crate) being placed in building before roof goes on (ship is 9 ft. by 6 ft. and too large to fit through entryways)

Sneak preview of the beautiful “Massachusetts of Boston.” Notice the
funeral on board – a tragic scene so typical of the voyage.

Second story beams being positioned (with the huge ship’s crate below)

Second story beams being delivered by crane

Laying the second story floor

Large roof sections are being positioned

Hoisting the ceremonial Village of Eenigenburg flag

One of the volunteer teams from the village on a much needed break

The building is enclosed…at last!!